This deliverable shows the generic interfaces required for the installation of the FCHPP and defines the
key aspects and codes of practices to be considered to ensure a proper and safe integration of the
FCHPP in a generic train.
FCH2RAIL deliverable D2.2 – Train-FCHPP interface. Block schematic
- Project Result