Project Results

FCH2RAIL deliverable D5.3 – Bi-mode FCH Multiple Unit TRL7 Service

The deliverable D5.3. – Bi-mode FCH Multiple Unit TRL7 Service is a video documenting the service experience with the FCH2RAIL demonstrator train on different lines in the Spanish and Portuguese railway networks.

The demonstrator train has successfully completed the testing and demonstration phase. The testing phase covered 10,000km in H2 mode, 6,000 km in electric mode, and 37 days of dynamic testing. Approximately 2,200kg of H2 have been consumed during this testing stage.

The video is available on YouTube:

In the D5.3 document a brief photographic report of the train demonstrator during the
service experience campaign is included, together with some characteristic aspects of the test in every
line.

Contact

Holger Dittus

Institute of Vehicle Concepts (DLR)