Project Results

FCH2RAIL deliverable D5.1 – Implementation and Integration in Demonstrator Train

The deliverable D5.1. – FCHPP Implementation and Integration in Demonstrator Train is a photo report documenting the integration of two Fuel Cell Hybrid PowerPacks into the CIVIA demonstrator train. The  passenger area in the demonstrator train was transformed into a technical area, the FCHPPs are installed there and on the roof. The new equipment is integrated into both the existing traction architecture and the existing train control architecture.

Contact

Holger Dittus

Institute of Vehicle Concepts (DLR)