FCH2RAIL deliverable D1.1 – Report concerning line and use case based requirements

This deliverable is describing the analysis and gathering of requirements on hydrogen trains from operational and infrastructural parameters. This is done within two steps. First a high-level line analysis is performed to collect infrastructural and operational characteristics for various countries in the European Union. In the second step, representative use-cases are identified and simulated to evaluate detailed requirements on the FCHPP.